Besi Datacon8800advanced芯片焊接机
时间:2017-08-12 阅读:1835
Besi Datacon 8800 CHAMEO advanced 芯片焊接机
Highest Productivity for FO-WLP
As a new advanced packaging technology, Wafer-Level Fan-Out Packaging (WL-FOP) is a cost effective solution to address increasing demands for performance, form factor, and warpage control.
The Datacon 8800 CHAMEO advanced bonder raises a field proven platform concept to an advanced level. It is the perfect fit for chip attach of any WL-FOP process, supporting both face-down (flip mode) and face-up (non flip mode) package designs.
Key Features
Multi-Chip – Combining Speed, Flexibility and Accuracy
- Multi-chip capability – Flexibility on smallest footprint
- Single pass is king – Improve your Cpk for multi-FC packages
- Waffle pack feeders – Extend your possibilities
- Extra Speed up to +40%
Enhanced Capabilities – Ready for the Future
- Thermo-compression – No limits for your applications
- Leadframe, strip, boat, wafer – No limits for your substrates
- Customized features – Exactly tailored for your process
- 300 mm / 340 mm Fan Out Wafer Level Packages (FO-WLP) Carrier
- Face-down & Face-up (recipe controlled)
- Clean room class ISO 5
- Foup load port
- Tape & Reel
Highest Accuracy – Capturing Tomorrow’s Markets
- Highest Accuracy ± 5 µm / 3 µm @ 3 Sigma – For fine-pitch and TSV applications
- Local reflow – Mastering sophisticated assemblies
- Long-term stability – Securing high yield at high speed
Wafer Level Applications
- Fan-Out Wafer Level Packages – Highest performance for lowest cost
- Advanced Chip to Wafer – Cost effective dual die stacking
- Through Silicon Vias (TSV) – Entry ticket to the future
Local accuracy | ± 3 µm @ 3 sigma |
---|---|
Global accuracy | ± 5 µm @ 3 sigma |
Vision system | 4 Mpix, 6 x 6 mm FOV |
Strips, Boats, Panels | 340 mm |
C2W | 12" |
Fluxer | option |
Multi Chip | included |
UPH (dipping process) | 6000 |
UPH (FO-WLP / no dipping) | 7000 |
Clean room class | ISO 5 (optionally) |
Face-down | included |
Face-up | option |
Tape & Reel | option |
FOUP load port | option |
Temperature | option (constant) |
Capability integrity | enhanced standard |
Pre-heat Station | option |
Local reflow | not available |
Lead time | 8-10 weeks |